Zum Inhalt springen
KNOWLEDGE

Prototype vs. Production Sun Gears: What Changes in the RFQ

Prototype and series sun gears should share one approved geometry, but tooling, inspection strategy and process economics can change as volume grows.

Technical GuideSun GearPlanetary Gear
Prototype vs. Production Sun Gears: What Changes in the RFQ

Why this topic changes the sun gear decision

Procurement is easier when prototype versus series supply is defined in a controlled record rather than scattered through emails. Geometry, interface, process, duty, acceptance and quantity should be distinguishable.

Prototype and repeat production can use different tooling or sampling strategies while keeping the same approved geometry.

Practical design and replacement implications

State which documents are required with shipment and whether a first-article or pilot approval is needed. Add destination and Incoterm so the commercial scope is clear.

For replacement sourcing, machine references support identification, but measured gear and interface data remain the production control.

Practical design and replacement implications

What to control on the RFQ or drawing

Artikel What to define
Tooth system Tooth count, module/DP, pressure angle, helix and profile shift/modification when applicable.
Planetary context Mating planet/ring data and planet count when available.
Center interface Bore, keyway, spline, hollow center or integrated shaft plus functional datums.
Pflicht Rated/peak torque, speed, reversals/shock, life, lubrication and environment.
Verfahren Controlled material, heat treatment, finishing and coating requirements.
Acceptance Tooth/runout/dimensional inspection and required documentation.

Häufig gestellte Fragen

Can one loose sun gear answer every design question?

Usually not. Mating gear data and the center interface provide important cross-checks.

Should material or tolerance be copied from a similar part?

Only when the controlled design allows it. Similar appearance is not proof of the same duty or specification.

What is the fastest way to get a useful quote?

Send the latest drawing or measured tooth/interface data, mating component information, duty, acceptance needs and quantity.

Angebotsanfrage

Angebot anfordern / Angebotsanfrage senden

Send the drawing, mating gear information, center interface, duty, inspection needs and quantity. The article is selection guidance; the approved drawing controls production.

Angebotsanfrage senden

MindestbestellmengeFlexibel nach Produkttyp und Gesamtbestellwert.
ProbenNeukunden können 1-5 Stück anfordern, sofern das Teil und der Herstellungsprozess geeignet sind.
Gemischte BestellungenVerschiedene Sonnenrad- oder Planetengetriebekomponenten können kombiniert werden, wenn der Gesamtbestellwert bei etwa 1.500 USD oder darüber liegt.
KleinbestellungenBestellungen von 1-2 Stück können besprochen werden, in der Regel mit einem höheren Stückpreis.
LieferungStandardteile: 10–25 Werktage. Kundenspezifische Komponenten: 20–45 Werktage. Projektausrüstung: 45–120 Werktage.
HandelsbedingungenEXW, FOB, CIF und DAP werden häufig unterstützt. FCA, CFR, CPT, CIP und DDP können im Einzelfall besprochen werden.