Ir para o conteúdo
KNOWLEDGE

Sun Gear Materials and Heat Treatment: RFQ Checklist

Material and heat treatment should be selected from load, life and drawing requirements rather than copied from an unrelated gear.

Technical GuidePlanetary GearSolicitação de Cotação
Sun Gear Materials and Heat Treatment: RFQ Checklist

Material definition

Use the controlled grade and condition stated by the design, including any substitution approval process.

Hardness and case

If case hardening is required, specify surface hardness, effective case depth and core requirement where controlled.

Verification

Ask for the material/heat-treatment records that are actually required by your quality plan.

Use the drawing as the controlled record

A technical guide can explain which variables matter, but the final sun gear must be approved from the actual drawing and operating requirement.

If a value is missing, identify it for confirmation instead of copying a dimension or material from a different supplier or gear family.

Sun Gear Materials and Heat Treatment: RFQ Checklist technical context

RFQ checklist

Send the sun gear drawing or measured tooth data, mating planet/ring information, interface dimensions, material/process requirements, duty, quantity and destination.

Deeper buyer guidance

Material and heat treatment should be tied to duty and the approved design. Hardness alone is not a complete specification.

For new designs, use the complete planetary geometry and functional datums before deciding the process route. For replacement work, use photos and equipment references for context but let measured tooth and interface data control the new part.

Deeper buyer guidance

What to control on the RFQ or drawing

Item What to define
Planetary mesh Sun, planet and ring tooth data plus planet count when known.
Center interface Bore, key, spline or shaft features with functional datums.
Operating duty Rated/peak torque, speed, reversals/shock, life and environment.
Material/process Controlled material, heat treatment, finish and coating requirements.
Acceptance Gear/runout/dimensional checks and required documentation.

Frequently asked questions

Can a visual match confirm interchangeability?

No. Similar outside dimensions can hide different pitch systems, pressure angles, profile shift or interface fits.

Should mating gear data be included?

Yes whenever available, because planetary geometry is easier to verify as a system.

What if a value is unknown?

Mark it as open and provide the available sample, mating component or application data rather than guessing.

Solicitação de Cotação

Solicitar um orçamento / Enviar solicitação de cotação

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Enviar solicitação de cotação

MOQFlexível por tipo de produto e valor total do pedido.
AmostrasNovos clientes podem solicitar de 1 a 5 peças, quando a peça e o processo forem adequados.
Pedidos mistosDiferentes modelos de engrenagens solares ou componentes planetários relacionados podem ser combinados quando o valor total do pedido for de aproximadamente USD 1.500 ou mais.
Encomendas pequenasEncomendas de 1 a 2 unidades podem ser discutidas, normalmente com um custo unitário mais elevado.
EntregaPeças padrão: 10 a 25 dias úteis. Componentes personalizados: 20 a 45 dias úteis. Equipamentos para projetos: 45 a 120 dias úteis.
Termos comerciaisEXW, FOB, CIF e DAP são geralmente aceitos. FCA, CFR, CPT, CIP e DDP podem ser discutidos caso a caso.