انتقل إلى المحتوى
SUN GEAR PRODUCTS

Hollow Sun Gears

Sun gears with through-bores or hollow interfaces for compact coaxial planetary arrangements.

Hollow Sun GearsPlanetary DriveCustom RFQ
Hollow Sun Gears

Technical specification / ordering data

Parameter What to Specify
Tooth geometry Module/DP, pressure angle, tooth count and any profile shift.
Bore Diameter, fit, keyway/spline if present and axial length.
Wall / hub geometry Section thickness, shoulders and retention features.
Mating components Planet gear and ring gear data.
Material / heat treatment Per application and drawing.
Inspection Bore-to-tooth concentricity and required tooth measurements.

Selection points

These are the questions to close before production.

Mating planet gears

Confirm the mating tooth count, pitch system and pressure angle rather than identifying the sun gear in isolation.

Concentricity & runout

Define the datum relationship among gear teeth, bore/spline/shaft and bearing seats.

Duty

Rated and peak torque, speed, reversals, shock and life influence material/process decisions.

Inspection

Agree the report content before production when tooth or interface verification is critical.

Replacement and custom projects

Sun gears with through-bores or hollow interfaces for compact coaxial planetary arrangements.

For replacement hollow sun gears, verify bore fit, bore-to-tooth concentricity and the mating planet/ring geometry together. Photos can show the arrangement, but the controlled measurements determine interchangeability.

Hollow Sun Gears product image
طلب عرض أسعار

طلب عرض سعر / إرسال طلب عرض سعر

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Send RFQ

الحد الأدنى للطلبمرونة حسب نوع المنتج وقيمة الطلب الإجمالية.
عيناتيمكن للعملاء الجدد طلب من 1 إلى 5 قطع عندما يكون الجزء والعملية مناسبين.
طلبات مختلطةDifferent sun gear or related planetary-component models can be combined when the total order value is around USD 1,500 or above.
الطلبات الصغيرةيمكن مناقشة الطلبات التي تتراوح بين قطعة واحدة وقطعتين، وعادةً ما تكون بتكلفة وحدة أعلى.
توصيلالأجزاء القياسية: من 10 إلى 25 يوم عمل. المكونات المصممة حسب الطلب: من 20 إلى 45 يوم عمل. معدات المشاريع: من 45 إلى 120 يوم عمل.
شروط التجارةتُدعم شروط EXW وFOB وCIF وDAP بشكل شائع. أما شروط FCA وCFR وCPT وCIP وDDP فيمكن مناقشتها حسب كل حالة على حدة.