Przejdź do treści
KNOWLEDGE

Prototype vs. Production Sun Gears: What Changes in the RFQ

Prototype and series sun gears should share one approved geometry, but tooling, inspection strategy and process economics can change as volume grows.

Technical GuideSun GearPlanetary Gear
Prototype vs. Production Sun Gears: What Changes in the RFQ

Why this topic changes the sun gear decision

Procurement is easier when prototype versus series supply is defined in a controlled record rather than scattered through emails. Geometry, interface, process, duty, acceptance and quantity should be distinguishable.

Prototype and repeat production can use different tooling or sampling strategies while keeping the same approved geometry.

Practical design and replacement implications

State which documents are required with shipment and whether a first-article or pilot approval is needed. Add destination and Incoterm so the commercial scope is clear.

For replacement sourcing, machine references support identification, but measured gear and interface data remain the production control.

Practical design and replacement implications

What to control on the RFQ or drawing

Przedmiot What to define
Tooth system Tooth count, module/DP, pressure angle, helix and profile shift/modification when applicable.
Planetary context Mating planet/ring data and planet count when available.
Center interface Bore, keyway, spline, hollow center or integrated shaft plus functional datums.
Obowiązek Rated/peak torque, speed, reversals/shock, life, lubrication and environment.
Proces Controlled material, heat treatment, finishing and coating requirements.
Acceptance Tooth/runout/dimensional inspection and required documentation.

Frequently asked questions

Can one loose sun gear answer every design question?

Usually not. Mating gear data and the center interface provide important cross-checks.

Should material or tolerance be copied from a similar part?

Only when the controlled design allows it. Similar appearance is not proof of the same duty or specification.

What is the fastest way to get a useful quote?

Send the latest drawing or measured tooth/interface data, mating component information, duty, acceptance needs and quantity.

Zapytanie ofertowe

Poproś o wycenę / Wyślij zapytanie ofertowe

Send the drawing, mating gear information, center interface, duty, inspection needs and quantity. The article is selection guidance; the approved drawing controls production.

Wyślij zapytanie ofertowe

Minimalne zamówienieElastyczne ze względu na typ produktu i całkowitą wartość zamówienia.
PróbkiNowi klienci mogą zamówić od 1 do 5 sztuk, jeśli część i proces są odpowiednie.
Zamówienia mieszaneMożna łączyć różne modele przekładni słonecznych i powiązanych z nimi elementów planetarnych, jeśli całkowita wartość zamówienia wynosi około 1500 USD lub więcej.
Małe zamówieniaZamówienia obejmujące 1–2 sztuki podlegają negocjacjom, zazwyczaj przy wyższej cenie jednostkowej.
DostawaCzęści standardowe: 10–25 dni roboczych. Komponenty niestandardowe: 20–45 dni roboczych. Sprzęt projektowy: 45–120 dni roboczych.
Warunki handloweObsługiwane są powszechnie warunki EXW, FOB, CIF i DAP. Warunki FCA, CFR, CPT, CIP i DDP mogą być omawiane indywidualnie w każdym przypadku.