ข้ามไปยังเนื้อหา
KNOWLEDGE

Case Hardening and Carburizing for Sun Gears

Case-hardening routes can combine a wear-resistant tooth surface with a tougher core, but material, case depth, hardness and finishing need to be specified together.

Technical GuideSun GearPlanetary Gear
Case Hardening and Carburizing for Sun Gears

Why this topic changes the sun gear decision

The useful manufacturing question is how case hardening and carburizing protects the function defined on the drawing. Process names are not quality levels by themselves; the required tooth, runout, hardness and interface results are what matter.

Heat treatment can move the part, so machining allowance and final datum recovery should be planned before hardening when tight gear, bore or shaft relationships are required.

Practical design and replacement implications

Inspection should match the acceptance plan. Tooth-size checks, runout, profile/lead, hardness and dimensional measurements are selected according to the drawing and application rather than applied as a generic bundle.

If reports or certificates are required, state them at RFQ stage so the manufacturing and sampling plan can include them.

Practical design and replacement implications

What to control on the RFQ or drawing

รายการ What to define
Tooth system Tooth count, module/DP, pressure angle, helix and profile shift/modification when applicable.
Planetary context Mating planet/ring data and planet count when available.
Center interface Bore, keyway, spline, hollow center or integrated shaft plus functional datums.
หน้าที่ Rated/peak torque, speed, reversals/shock, life, lubrication and environment.
กระบวนการ Controlled material, heat treatment, finishing and coating requirements.
Acceptance Tooth/runout/dimensional inspection and required documentation.

คำถามที่พบบ่อย

Can one loose sun gear answer every design question?

Usually not. Mating gear data and the center interface provide important cross-checks.

Should material or tolerance be copied from a similar part?

Only when the controlled design allows it. Similar appearance is not proof of the same duty or specification.

What is the fastest way to get a useful quote?

Send the latest drawing or measured tooth/interface data, mating component information, duty, acceptance needs and quantity.

คำขอเสนอราคา (RFQ)

ขอใบเสนอราคา / ส่ง RFQ

Send the drawing, mating gear information, center interface, duty, inspection needs and quantity. The article is selection guidance; the approved drawing controls production.

ส่งคำขอเสนอราคา (RFQ)

MOQสามารถปรับเปลี่ยนได้ตามประเภทสินค้าและมูลค่าการสั่งซื้อรวม
ตัวอย่างลูกค้าใหม่สามารถสั่งซื้อได้ 1-5 ชิ้น หากชิ้นส่วนและกระบวนการเหมาะสม
คำสั่งซื้อแบบผสมสามารถเลือกซื้อชุดเฟืองดวงอาทิตย์หรือชิ้นส่วนระบบเฟืองดาวเคราะห์รุ่นต่างๆ มาผสมผสานกันได้ เมื่อมูลค่าการสั่งซื้อรวมอยู่ที่ประมาณ 1,500 ดอลลาร์สหรัฐขึ้นไป
คำสั่งซื้อขนาดเล็กสามารถพิจารณาสั่งซื้อตั้งแต่ 1-2 ชิ้นขึ้นไปได้ โดยปกติแล้วราคาต่อหน่วยจะสูงกว่าปกติ
จัดส่งชิ้นส่วนมาตรฐาน: 10-25 วันทำการ ชิ้นส่วนสั่งทำพิเศษ: 20-45 วันทำการ อุปกรณ์สำหรับโครงการ: 45-120 วันทำการ
เงื่อนไขการค้าEXW, FOB, CIF และ DAP เป็นรูปแบบสัญญาที่ใช้กันทั่วไป ส่วน FCA, CFR, CPT, CIP และ DDP นั้น สามารถพิจารณาเป็นกรณีๆ ไปได้