Case-hardening routes can combine a wear-resistant tooth surface with a tougher core, but material, case depth, hardness and finishing need to be specified together.

Technical GuideSun GearPlanetary Gear
Case Hardening and Carburizing for Sun Gears

Why this topic changes the sun gear decision

The useful manufacturing question is how case hardening and carburizing protects the function defined on the drawing. Process names are not quality levels by themselves; the required tooth, runout, hardness and interface results are what matter.

Heat treatment can move the part, so machining allowance and final datum recovery should be planned before hardening when tight gear, bore or shaft relationships are required.

Practical design and replacement implications

Inspection should match the acceptance plan. Tooth-size checks, runout, profile/lead, hardness and dimensional measurements are selected according to the drawing and application rather than applied as a generic bundle.

If reports or certificates are required, state them at RFQ stage so the manufacturing and sampling plan can include them.

Practical design and replacement implications

What to control on the RFQ or drawing

Öğe What to define
Tooth system Tooth count, module/DP, pressure angle, helix and profile shift/modification when applicable.
Planetary context Mating planet/ring data and planet count when available.
Center interface Bore, keyway, spline, hollow center or integrated shaft plus functional datums.
Duty Rated/peak torque, speed, reversals/shock, life, lubrication and environment.
İşlem Controlled material, heat treatment, finishing and coating requirements.
Acceptance Tooth/runout/dimensional inspection and required documentation.

Frequently asked questions

Can one loose sun gear answer every design question?

Usually not. Mating gear data and the center interface provide important cross-checks.

Should material or tolerance be copied from a similar part?

Only when the controlled design allows it. Similar appearance is not proof of the same duty or specification.

What is the fastest way to get a useful quote?

Send the latest drawing or measured tooth/interface data, mating component information, duty, acceptance needs and quantity.

RFQ

Teklif İsteği Gönder / Fiyat Teklifi Talebi Gönder

Send the drawing, mating gear information, center interface, duty, inspection needs and quantity. The article is selection guidance; the approved drawing controls production.

Send RFQ

Minimum Sipariş MiktarıÜrün türüne ve toplam sipariş değerine göre esnektir.
ÖrneklerYeni müşteriler, parça ve işlem uygun olduğunda 1 ila 5 adet arasında sipariş verebilirler.
Karışık siparişlerDifferent sun gear or related planetary-component models can be combined when the total order value is around USD 1,500 or above.
Küçük siparişler1-2 adetlik siparişler görüşülebilir, ancak genellikle birim fiyatı daha yüksek olur.
TeslimatStandart parçalar: 10-25 iş günü. Özel üretim parçalar: 20-45 iş günü. Proje ekipmanları: 45-120 iş günü.
Ticaret şartlarıEXW, FOB, CIF ve DAP genellikle desteklenmektedir. FCA, CFR, CPT, CIP ve DDP ise duruma göre görüşülebilir.