콘텐츠로 바로가기
SUN GEAR PRODUCTS

선 기어 샤프트

Integrated gear-and-shaft components for planetary systems where gear teeth, journals, splines and retention features share one datum structure.

선 기어 샤프트Planetary DriveCustom RFQ
선 기어 샤프트

Technical specification / ordering data

Parameter What to Specify
Gear section Module/DP, pressure angle, tooth count and tooth finish.
Shaft journals Diameters, fits, lengths and surface-finish requirements.
Spline / key / thread Drive and retention features per drawing.
Bearing seats Datum, shoulder and runout relationships.
열처리 Controlled with attention to gear and shaft requirements.
Inspection Gear runout plus shaft/spline dimensional and geometric checks as specified.

Selection points

These are the questions to close before production.

Mating planet gears

Confirm the mating tooth count, pitch system and pressure angle rather than identifying the sun gear in isolation.

Concentricity & runout

Define the datum relationship among gear teeth, bore/spline/shaft and bearing seats.

Duty

Rated and peak torque, speed, reversals, shock and life influence material/process decisions.

Inspection

Agree the report content before production when tooth or interface verification is critical.

Replacement and custom projects

Integrated gear-and-shaft components for planetary systems where gear teeth, journals, splines and retention features share one datum structure.

For an existing sun gear shaft, measure the complete shaft stack-up including journals, shoulders, spline or key features and their runout to the gear teeth. Photos are useful for context, not dimensional approval.

Sun Gear Shafts product image
견적 요청

견적 요청 / RFQ 제출

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Send RFQ

최소 주문 수량제품 종류 및 총 주문 금액에 따라 유연하게 적용됩니다.
샘플신규 고객은 부품 및 공정이 적합한 경우 1~5개까지 주문할 수 있습니다.
혼합 주문총 주문 금액이 미화 1,500달러 이상일 경우, 서로 다른 태양 구동 장치 또는 관련 유성 기어 부품 모델을 조합하여 사용할 수 있습니다.
소량 주문1~2개 주문도 협의 가능하며, 일반적으로 단가가 더 높습니다.
배달표준 부품: 10~25 영업일. 맞춤형 부품: 20~45 영업일. 프로젝트 장비: 45~120 영업일.
거래 조건EXW, FOB, CIF 및 DAP는 일반적으로 지원되는 조건입니다. FCA, CFR, CPT, CIP 및 DDP는 사례별로 협의 가능합니다.