Langkau ke kandungan
SUN GEAR PRODUCTS

Aci Gear Matahari

Integrated gear-and-shaft components for planetary systems where gear teeth, journals, splines and retention features share one datum structure.

Aci Gear MatahariPlanetary DriveCustom RFQ
Aci Gear Matahari

Technical specification / ordering data

Parameter What to Specify
Gear section Module/DP, pressure angle, tooth count and tooth finish.
Shaft journals Diameters, fits, lengths and surface-finish requirements.
Spline / key / thread Drive and retention features per drawing.
Bearing seats Datum, shoulder and runout relationships.
Rawatan haba Controlled with attention to gear and shaft requirements.
Inspection Gear runout plus shaft/spline dimensional and geometric checks as specified.

Selection points

These are the questions to close before production.

Mating planet gears

Confirm the mating tooth count, pitch system and pressure angle rather than identifying the sun gear in isolation.

Concentricity & runout

Define the datum relationship among gear teeth, bore/spline/shaft and bearing seats.

Duty

Rated and peak torque, speed, reversals, shock and life influence material/process decisions.

Inspection

Agree the report content before production when tooth or interface verification is critical.

Replacement and custom projects

Integrated gear-and-shaft components for planetary systems where gear teeth, journals, splines and retention features share one datum structure.

For an existing sun gear shaft, measure the complete shaft stack-up including journals, shoulders, spline or key features and their runout to the gear teeth. Photos are useful for context, not dimensional approval.

Sun Gear Shafts product image
RFQ

Minta Sebut Harga / Hantar RFQ

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Send RFQ

MOQFleksibel mengikut jenis produk dan jumlah nilai pesanan.
SampelPelanggan baharu boleh meminta 1-5 keping apabila bahagian dan prosesnya sesuai.
Pesanan campuranGear matahari yang berbeza atau model komponen planet yang berkaitan boleh digabungkan apabila jumlah nilai pesanan sekitar USD 1,500 atau lebih.
Pesanan kecilPesanan 1-2 keping boleh dibincangkan, biasanya dengan kos seunit yang lebih tinggi.
PenghantaranBahagian standard: 10-25 hari bekerja. Komponen tersuai: 20-45 hari bekerja. Peralatan projek: 45-120 hari bekerja.
Terma perdaganganEXW, FOB, CIF dan DAP biasanya disokong. FCA, CFR, CPT, CIP dan DDP boleh dibincangkan mengikut kes.