Hopp til innhold
KNOWLEDGE

Sun Gear Bore, Keyway or Spline: Interface Choices

The center interface determines how torque enters the sun gear and how accurately the part stays on the planetary centerline.

Technical GuideSun GearPlanetary Gear
Sun Gear Bore, Keyway or Spline: Interface Choices

Why this topic changes the sun gear decision

The key engineering question is bore, keyway and spline options. The center interface carries torque and also establishes how the sun gear is located relative to bearings, the carrier and the mating planets.

A dimensionally correct interface can still produce poor tooth contact if it is eccentric to the external gear teeth. Fits and datums therefore belong in the same review as the gear geometry.

Practical design and replacement implications

For replacement work, measure the mating shaft or hub when possible. Service wear can change spline tooth thickness, keyway condition or bore size and should not be copied into the new drawing.

For new designs, define engagement length, lead-in features, retention and service access along with the torque requirement.

Practical design and replacement implications

What to control on the RFQ or drawing

Item What to define
Tooth system Tooth count, module/DP, pressure angle, helix and profile shift/modification when applicable.
Planetary context Mating planet/ring data and planet count when available.
Center interface Bore, keyway, spline, hollow center or integrated shaft plus functional datums.
Plikt Rated/peak torque, speed, reversals/shock, life, lubrication and environment.
Process Controlled material, heat treatment, finishing and coating requirements.
Acceptance Tooth/runout/dimensional inspection and required documentation.

Frequently asked questions

Can one loose sun gear answer every design question?

Usually not. Mating gear data and the center interface provide important cross-checks.

Should material or tolerance be copied from a similar part?

Only when the controlled design allows it. Similar appearance is not proof of the same duty or specification.

What is the fastest way to get a useful quote?

Send the latest drawing or measured tooth/interface data, mating component information, duty, acceptance needs and quantity.

Anbudsforespørsel

Be om et tilbud / Send en forespørsel

Send the drawing, mating gear information, center interface, duty, inspection needs and quantity. The article is selection guidance; the approved drawing controls production.

Send forespørsel

MOQFleksibel etter produkttype og total ordreverdi.
PrøverNye kunder kan be om 1–5 deler når delen og prosessen passer.
Blandede bestillingerUlike soldrev eller relaterte planetkomponentmodeller kan kombineres når den totale ordreverdien er rundt USD 1500 eller mer.
Små bestillingerBestillinger fra 1-2 stk. kan diskuteres, vanligvis med en høyere enhetspris.
LeveranseStandarddeler: 10–25 virkedager. Tilpassede komponenter: 20–45 virkedager. Prosjektutstyr: 45–120 virkedager.
HandelsvilkårEXW, FOB, CIF og DAP støttes vanligvis. FCA, CFR, CPT, CIP og DDP kan diskuteres fra sak til sak.