跳至内容
AUTOMATION

Sun Gears for Industrial Automation

Automation and servo-driven planetary systems put more emphasis on backlash, concentricity and repeatability. A compact gear still needs a complete interface definition.

责任界面检查
Sun Gears for Industrial Automation

应用特定询价清单

范围 需要具体说明什么
职责数据 Continuous or indexing duty, reversals, speed, acceleration and torque.
几何学 Backlash target, tooth quality requirement and planetary tooth counts.
界面 Spline/bore fit, concentricity datums and shaft/bearing arrangement.
风险点 Small errors in runout, fit or backlash can appear as positioning error at the machine.

确认整个行星界面

In positioning systems, runout between the sun gear teeth and the shaft or spline datum can become visible as cyclic transmission error, so the datum structure belongs in the RFQ.

If a drawing is unavailable, combine gear measurements with backlash expectations, mating-gear data and the shaft/spline datum so the replacement can be reviewed for repeatability rather than appearance alone.

Sun Gears for Industrial Automation application context

Precision motion considerations

Reversals make backlash, runout and interface fit visible in the machine, so the gear-to-spline or gear-to-shaft datum relationship matters.

For a new design, define the sun/planet/ring tooth relationship before finalizing the center interface. For replacement work, inspect the planets, ring, carrier support and lubrication condition so a new sun gear is not installed into an already damaged stage.

Use the application to decide which measurements deserve the most attention: peak torque and shock for heavy equipment, backlash and runout for motion systems, or life and documentation for long-duration duty.

Precision motion considerations
询价

索取报价/发送询价单

Send the sun gear drawing or measurements, mating gear data, backlash target, servo duty, interface tolerances and quantity.

发送询价单

最小起订量按产品类型和订单总金额灵活调整。
样品新客户在零件和工艺合适时可以订购 1-5 件。
混合订单当订单总额达到 1500 美元或以上时,可以组合使用不同的太阳轮或相关行星组件型号。
小订单1-2 件的订单可以商议,但通常单价会更高。
送货标准件:10-25个工作日。定制组件:20-45个工作日。项目设备:45-120个工作日。
贸易条款EXW、FOB、CIF 和 DAP 是常用的贸易条款。FCA、CFR、CPT、CIP 和 DDP 则需具体情况具体分析。