跳至内容
INDUSTRIAL PLANETARY DRIVES

Sun Gears for Planetary Gearboxes

Planetary gearboxes place the sun gear at the center of the mesh. A reliable RFQ must treat the sun gear, planet gears, ring gear and carrier geometry as one system.

责任界面检查
Sun Gears for Planetary Gearboxes

应用特定询价清单

范围 需要具体说明什么
职责数据 Rated and peak torque, input/output speed, starts, reversals and target life.
几何学 Sun/planet/ring tooth counts, module or DP, pressure angle and any profile shift.
界面 Spline, shaft, bore, bearing-seat and retention details.
风险点 Load sharing and tooth-contact errors can concentrate load on one planet path.

确认整个行星界面

Start by identifying which planetary member is input, output or fixed, then verify the sun-to-planet mesh and the ring-gear relationship before manufacturing.

When the original gearbox drawing is missing, supply tooth counts for the sun, planets and ring, plus carrier/center-distance information so the stage can be checked as a complete gear train.

Sun Gears for Planetary Gearboxes application context

System-level selection for industrial planetary stages

The sun gear may be the fastest member in the stage, so tooth accuracy, runout, lubrication and shaft/spline alignment all influence service behavior.

For a new design, define the sun/planet/ring tooth relationship before finalizing the center interface. For replacement work, inspect the planets, ring, carrier support and lubrication condition so a new sun gear is not installed into an already damaged stage.

Use the application to decide which measurements deserve the most attention: peak torque and shock for heavy equipment, backlash and runout for motion systems, or life and documentation for long-duration duty.

System-level selection for industrial planetary stages
询价

索取报价/发送询价单

Send the gearbox drawing, sun/planet/ring tooth counts, input and output duty, interface dimensions and quantity. Include the gearbox nameplate when the request is for a replacement.

发送询价单

最小起订量按产品类型和订单总金额灵活调整。
样品新客户在零件和工艺合适时可以订购 1-5 件。
混合订单当订单总额达到 1500 美元或以上时,可以组合使用不同的太阳轮或相关行星组件型号。
小订单1-2 件的订单可以商议,但通常单价会更高。
送货标准件:10-25个工作日。定制组件:20-45个工作日。项目设备:45-120个工作日。
贸易条款EXW、FOB、CIF 和 DAP 是常用的贸易条款。FCA、CFR、CPT、CIP 和 DDP 则需具体情况具体分析。