跳至内容
SUN GEAR PRODUCTS

Standard Sun Gears

External sun gears for planetary transmissions, quoted from the tooth system, mating gear geometry and bore/interface drawing.

Standard Sun GearsPlanetary DriveCustom RFQ
Standard Sun Gears

Technical specification / ordering data

Parameter What to Specify
Product form External sun gear; spur or helical as defined by the planetary design.
音调系统 Module or DP per drawing.
压力角 Per mating planet gear / drawing.
Tooth count Defined by the planetary ratio and center-distance geometry.
Bore / interface Plain bore, keyway, spline or other controlled interface.
Material / heat treatment Per drawing and duty requirement.
Tooth finish Hobbed/shaped/ground as required by the drawing.
Inspection Tooth thickness/span/over-pin, runout/profile/lead or other agreed characteristics.

Selection points

These are the questions to close before production.

Mating planet gears

Confirm the mating tooth count, pitch system and pressure angle rather than identifying the sun gear in isolation.

Concentricity & runout

Define the datum relationship among gear teeth, bore/spline/shaft and bearing seats.

Duty

Rated and peak torque, speed, reversals, shock and life influence material/process decisions.

Inspection

Agree the report content before production when tooth or interface verification is critical.

Replacement and custom projects

External sun gears for planetary transmissions, quoted from the tooth system, mating gear geometry and bore/interface drawing.

For replacement standard sun gears, confirm the tooth system and mating planet/ring geometry before using outside diameter as a selection reference. Photos help identify the layout, but measured tooth data control the part.

Standard Sun Gears product image
询价

索取报价/发送询价单

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

发送询价单

最小起订量按产品类型和订单总金额灵活调整。
样品新客户在零件和工艺合适时可以订购 1-5 件。
混合订单Different sun gear or related planetary-component models can be combined when the total order value is around USD 1,500 or above.
小订单1-2 件的订单可以商议,但通常单价会更高。
送货标准件:10-25个工作日。定制组件:20-45个工作日。项目设备:45-120个工作日。
贸易条款EXW、FOB、CIF 和 DAP 是常用的贸易条款。FCA、CFR、CPT、CIP 和 DDP 则需具体情况具体分析。