Sun Gear Materials and Heat Treatment: RFQ Checklist

Material and heat treatment should be selected from load, life and drawing requirements rather than copied from an unrelated gear.

Technical GuidePlanetary Gear見積依頼書
Sun Gear Materials and Heat Treatment: RFQ Checklist

Material definition

Use the controlled grade and condition stated by the design, including any substitution approval process.

Hardness and case

If case hardening is required, specify surface hardness, effective case depth and core requirement where controlled.

Verification

Ask for the material/heat-treatment records that are actually required by your quality plan.

Use the drawing as the controlled record

A technical guide can explain which variables matter, but the final sun gear must be approved from the actual drawing and operating requirement.

If a value is missing, identify it for confirmation instead of copying a dimension or material from a different supplier or gear family.

Sun Gear Materials and Heat Treatment: RFQ Checklist technical context

RFQ checklist

Send the sun gear drawing or measured tooth data, mating planet/ring information, interface dimensions, material/process requirements, duty, quantity and destination.

Deeper buyer guidance

Material and heat treatment should be tied to duty and the approved design. Hardness alone is not a complete specification.

For new designs, use the complete planetary geometry and functional datums before deciding the process route. For replacement work, use photos and equipment references for context but let measured tooth and interface data control the new part.

Deeper buyer guidance

What to control on the RFQ or drawing

Item What to define
Planetary mesh Sun, planet and ring tooth data plus planet count when known.
Center interface Bore, key, spline or shaft features with functional datums.
Operating duty Rated/peak torque, speed, reversals/shock, life and environment.
Material/process Controlled material, heat treatment, finish and coating requirements.
Acceptance Gear/runout/dimensional checks and required documentation.

よくある質問

Can a visual match confirm interchangeability?

No. Similar outside dimensions can hide different pitch systems, pressure angles, profile shift or interface fits.

Should mating gear data be included?

Yes whenever available, because planetary geometry is easier to verify as a system.

What if a value is unknown?

Mark it as open and provide the available sample, mating component or application data rather than guessing.

見積依頼書

見積もり依頼/見積依頼を送信

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

見積依頼書を送信する

最小注文数量製品の種類と注文総額に応じて柔軟に対応します。
サンプル新規のお客様は、部品と製造工程が適切であれば、1~5個の注文をすることができます。
混合注文合計注文金額が1,500米ドル以上の場合、異なる太陽歯車装置や関連する遊星歯車機構のモデルを組み合わせて使用​​することができます。
小口注文1~2個からのご注文もご相談に応じますが、通常は単価が高くなります。
配達標準部品:10~25営業日。特注部品:20~45営業日。プロジェクト機器:45~120営業日。
取引条件EXW、FOB、CIF、DAPは一般的に対応可能です。FCA、CFR、CPT、CIP、DDPについては、個別にご相談ください。