Langkau ke kandungan
SUN GEAR PRODUCTS

Komponen Gear Planet

Related planet gears, ring gears and component sets for projects that require system-level matching around the sun gear.

Komponen Gear PlanetPlanetary DriveCustom RFQ
Komponen Gear Planet

Technical specification / ordering data

Parameter What to Specify
Component scope Sun gear, planet gear, internal ring gear and related matched components as required.
Tooth relationship Provide all tooth counts, pitch system and pressure angle.
Number of planets Needed to check spacing and assembly conditions.
Carrier / interface Pin diameter, face width, thrust/axial arrangement and bearing relationships where relevant.
Material / heat treatment Per drawing and duty for each component.
Inspection Define component and system-level checks required by the project.

Selection points

These are the questions to close before production.

Mating planet gears

Confirm the mating tooth count, pitch system and pressure angle rather than identifying the sun gear in isolation.

Concentricity & runout

Define the datum relationship among gear teeth, bore/spline/shaft and bearing seats.

Duty

Rated and peak torque, speed, reversals, shock and life influence material/process decisions.

Inspection

Agree the report content before production when tooth or interface verification is critical.

Replacement and custom projects

Related planet gears, ring gears and component sets for projects that require system-level matching around the sun gear.

For matched planetary components, provide the complete sun/planet/ring tooth relationship and carrier information so the set can be reviewed as one stage. Individual part photos are useful only as supporting context.

Planetary Gear Components product image
RFQ

Minta Sebut Harga / Hantar RFQ

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Send RFQ

MOQFleksibel mengikut jenis produk dan jumlah nilai pesanan.
SampelPelanggan baharu boleh meminta 1-5 keping apabila bahagian dan prosesnya sesuai.
Pesanan campuranGear matahari yang berbeza atau model komponen planet yang berkaitan boleh digabungkan apabila jumlah nilai pesanan sekitar USD 1,500 atau lebih.
Pesanan kecilPesanan 1-2 keping boleh dibincangkan, biasanya dengan kos seunit yang lebih tinggi.
PenghantaranBahagian standard: 10-25 hari bekerja. Komponen tersuai: 20-45 hari bekerja. Peralatan projek: 45-120 hari bekerja.
Terma perdaganganEXW, FOB, CIF dan DAP biasanya disokong. FCA, CFR, CPT, CIP dan DDP boleh dibincangkan mengikut kes.