The manufacturing route follows the drawing: blank preparation and turning, tooth generation, heat treatment, optional finishing, spline/shaft machining and inspection as required.

Tooth GenerationHeat Treatmentการตรวจสอบ
Sun Gear Manufacturing & Quality

Process planning around the part requirement

Not every sun gear needs every operation. The process should be selected from the drawing and duty.

Blank & datum preparation

Turning establishes the bore, faces, shoulders and reference diameters used by later gear and spline operations.

Gear cutting

Hobbing or shaping can be used for external tooth generation depending on geometry, access and required process.

Spline / shaft features

Internal or external spline, shaft journals, threads, keyways and retention features are machined to the controlled drawing.

การอบด้วยความร้อน

Material and hardness requirements are applied according to the drawing and application duty; case requirements should be stated explicitly.

Finishing

Grinding or other finishing is used when the drawing requires tighter tooth quality, runout or surface-finish control.

การตรวจสอบ

Inspection can include tooth thickness/span/over-pin measurements, runout, profile/lead data and interface dimensions as specified.

Inspection should match the risk

A dimensional report is useful only when it covers the characteristics that control assembly and mesh. For replacement gears, bore or spline fit, tooth thickness, runout and mating geometry usually deserve more attention than cosmetic measurements.

Tell us which records must accompany the shipment so the inspection plan is agreed before production.

Sun gear inspection and quality context
คำขอเสนอราคา (RFQ)

ขอใบเสนอราคา / ส่ง RFQ

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

ส่งคำขอเสนอราคา (RFQ)

MOQสามารถปรับเปลี่ยนได้ตามประเภทสินค้าและมูลค่าการสั่งซื้อรวม
ตัวอย่างลูกค้าใหม่สามารถสั่งซื้อได้ 1-5 ชิ้น หากชิ้นส่วนและกระบวนการเหมาะสม
คำสั่งซื้อแบบผสมDifferent sun gear or related planetary-component models can be combined when the total order value is around USD 1,500 or above.
คำสั่งซื้อขนาดเล็กสามารถพิจารณาสั่งซื้อตั้งแต่ 1-2 ชิ้นขึ้นไปได้ โดยปกติแล้วราคาต่อหน่วยจะสูงกว่าปกติ
จัดส่งชิ้นส่วนมาตรฐาน: 10-25 วันทำการ ชิ้นส่วนสั่งทำพิเศษ: 20-45 วันทำการ อุปกรณ์สำหรับโครงการ: 45-120 วันทำการ
เงื่อนไขการค้าEXW, FOB, CIF และ DAP เป็นรูปแบบสัญญาที่ใช้กันทั่วไป ส่วน FCA, CFR, CPT, CIP และ DDP นั้น สามารถพิจารณาเป็นกรณีๆ ไปได้