The manufacturing route follows the drawing: blank preparation and turning, tooth generation, heat treatment, optional finishing, spline/shaft machining and inspection as required.

Tooth GenerationHeat TreatmentInspection
Sun Gear Manufacturing & Quality

Process planning around the part requirement

Not every sun gear needs every operation. The process should be selected from the drawing and duty.

Blank & datum preparation

Turning establishes the bore, faces, shoulders and reference diameters used by later gear and spline operations.

Gear cutting

Hobbing or shaping can be used for external tooth generation depending on geometry, access and required process.

Spline / shaft features

Internal or external spline, shaft journals, threads, keyways and retention features are machined to the controlled drawing.

Heat treatment

Material and hardness requirements are applied according to the drawing and application duty; case requirements should be stated explicitly.

Finishing

Grinding or other finishing is used when the drawing requires tighter tooth quality, runout or surface-finish control.

Inspection

Inspection can include tooth thickness/span/over-pin measurements, runout, profile/lead data and interface dimensions as specified.

Inspection should match the risk

A dimensional report is useful only when it covers the characteristics that control assembly and mesh. For replacement gears, bore or spline fit, tooth thickness, runout and mating geometry usually deserve more attention than cosmetic measurements.

Tell us which records must accompany the shipment so the inspection plan is agreed before production.

Sun gear inspection and quality context
RFQ

Request a Quote / Send RFQ

Send the drawing, tooth data, mating-component information, duty and quantity. We will review the interface before quotation.

Send RFQ

MOQFlexible by product type and total order value.
SamplesNew customers may request 1-5 pieces when the part and process are suitable.
Mixed ordersDifferent sun gear or related planetary-component models can be combined when the total order value is around USD 1,500 or above.
Small ordersOrders from 1-2 pieces can be discussed, normally with a higher unit cost.
DeliveryStandard parts: 10-25 working days. Custom components: 20-45 working days. Project equipment: 45-120 working days.
Trade termsEXW, FOB, CIF and DAP are commonly supported. FCA, CFR, CPT, CIP and DDP can be discussed case by case.