Passer au contenu
MANUFACTURING & QUALITY

Sun Gear Manufacturing & Quality

The manufacturing route follows the drawing: blank preparation and turning, tooth generation, heat treatment, optional finishing, spline/shaft machining and inspection as required.

Tooth GenerationHeat TreatmentInspection
Sun Gear Manufacturing & Quality

Process planning around the part requirement

Not every sun gear needs every operation. The process should be selected from the drawing and duty.

Blank & datum preparation

Turning establishes the bore, faces, shoulders and reference diameters used by later gear and spline operations.

Gear cutting

Hobbing or shaping can be used for external tooth generation depending on geometry, access and required process.

Spline / shaft features

Internal or external spline, shaft journals, threads, keyways and retention features are machined to the controlled drawing.

Traitement thermique

Material and hardness requirements are applied according to the drawing and application duty; case requirements should be stated explicitly.

Finishing

Grinding or other finishing is used when the drawing requires tighter tooth quality, runout or surface-finish control.

Inspection

Inspection can include tooth thickness/span/over-pin measurements, runout, profile/lead data and interface dimensions as specified.

Inspection should match the risk

A dimensional report is useful only when it covers the characteristics that control assembly and mesh. For replacement gears, bore or spline fit, tooth thickness, runout and mating geometry usually deserve more attention than cosmetic measurements.

Tell us which records must accompany the shipment so the inspection plan is agreed before production.

Sun gear inspection and quality context

Typical process flow for a custom sun gear

Blank & datum preparation

Machine the reference surfaces that will control later tooth and interface operations.

Gear & interface machining

Generate external teeth and machine bore, spline or shaft features to the planned datum scheme.

Traitement thermique

Apply the controlled hardness/case route with allowance for distortion and final finishing.

Finishing & inspection

Finish critical teeth or bearing/interface surfaces and verify the characteristics required by the drawing.

Typical process flow for a custom sun gear

Practical buyer checkpoints

Topic Buyer guidance
Inspection is selective Measure the characteristics that protect function rather than adding generic paperwork.
Heat-treatment effects Plan stock and datum recovery before hardening when post-treatment finishing is required.
Integrated shaft risk Long shaft parts can need extra straightness/coaxiality attention after treatment.
Packaging is part of quality Protect finished teeth, splines and bearing seats from corrosion and metal-to-metal contact.
Demande de devis

Demande de devis / Envoyer une demande de prix

Veuillez nous envoyer le dessin, les données de denture, les informations sur les composants d'accouplement, le droit de passage et la quantité. Nous examinerons l'interface avant de vous établir un devis.

Envoyer une demande de devis

MOQFlexible selon le type de produit et la valeur totale de la commande.
ÉchantillonsLes nouveaux clients peuvent commander de 1 à 5 pièces lorsque la pièce et le processus le permettent.
Commandes mixtesDifférents modèles d'équipements solaires ou de composants planétaires apparentés peuvent être combinés lorsque la valeur totale de la commande est d'environ 1 500 USD ou plus.
petites commandesLes commandes de 1 à 2 pièces peuvent être discutées, généralement avec un coût unitaire plus élevé.
LivraisonPièces standard : 10 à 25 jours ouvrables. Composants sur mesure : 20 à 45 jours ouvrables. Équipements de projet : 45 à 120 jours ouvrables.
Conditions commercialesLes incoterms EXW, FOB, CIF et DAP sont généralement acceptés. Les incoterms FCA, CFR, CPT, CIP et DDP peuvent être discutés au cas par cas.